Some of you may remember that way back in July of 2015 I started work on a small diorama depicting a disused railway bridge. I built the model as an entry into that years Dave Brewer Memorial Challenge held at ExponNG at the end of October.
Over the roughly three months I spent working on the model I learnt an awful lot of useful and interesting techniques, and while I'd documented them on the blog I thought that, even though I'd not won the challenge, an article on the building of the model might be interesting to a wider audience than this blog enjoys.
Having written for Narrow Gauge & Industrial Railway Modelling REVIEW before I ran the idea past the editor, Roy C. Link, who agreed it was an interesting topic for an article. My original plan was to put an article together fairly quickly by pulling text and images from some of the blog posts I'd already written. Clearly things didn't quite go to plan as it took a year before the article was finished, but it finally appeared in the most recent issue (109) of the REVIEW.
It wasn't that I was particularly slow in writing the article, in fact as I hoped it would it started to come together quite quickly from the posts I'd already made. What happened was that I decided to include a little more of the history of the bridge and the railway it was part of in the article and once I started to do some research things kind of snowballed.
What I discovered was that the line over Duchal Moor was one of only two railways in Scotland, the other being at Dalmunzie, that had been built to aid access to grouse shooting moors. So my research expanded from a derelict bride to two entire railways and as such took a lot longer than planned. It also resulted in more details emerging than would sensibly fit in an article that was predominately about a small diorama so it became two articles; one on the modelling of the bridge and one entirely devoted to the history of the two lines.
Given that both lines were closed or abandoned over thirty years ago and neither were ever open to the general public tracking down enough information to produce an interesting article took some time. I was very fortunate that requests for information in a couple of places turned up people who had either visited one or other of the lines, or had useful photos and documents which they were willing to share. The result was a 12 page article including a detailed history of the lines and rolling stock, maps, and a number of previously unpublished photos. Of course these 12 pages are in addition to the 9 page article on the bridge model, hence the title of this post as issue 109 of the REVIEW contains 21 pages of my work. Viewed another way, assuming my maths is right, about 45% of the magazine is stuff I put together, so hopefully people will enjoy both articles; it's worth buying for the other 55% alone!
If you are interested in reading the articles then you'll have to pick up a copy of the REVIEW as I can't simply repost all the material here (you should be able to get issue 109 as a back issue shortly) but I do have one thing to share with you all.
When researching the line at Dalmunzie I came across an old cine film which had already been digitized and uploaded to YouTube. The entire film is made up of a number of reels shot over a number of years and shows life on the Dalmunzie estate. While the whole film is interesting if you are only interested in the railway then there are three clips at 8:30, 29:50, and 30:40.
Showing posts with label Duchal Moor Railway. Show all posts
Showing posts with label Duchal Moor Railway. Show all posts
Thursday, January 26, 2017
Monday, July 20, 2015
Duchal Moor Railway
When I originally started work on a bridge for the Dave Brewer challenge I wasn't sure if I was going to copy an existing bridge or just use one for inspiration. That is why, until now, I've specifically not mentioned the bridge I'd been looking at. Of course, as comments on recent posts have shown, it's difficult for any of you to make comments on how accurate something I've modelled is if you have no real idea of what it should look like, so......
The Duchal Moor Railway, known locally as the Grouse Moor Line, was built by the shipbuilder James Lithgow to help transport people and equipment out to the shooting butts on the moor. When completed in 1922 there was approximately 7 miles of 2ft gauge track. The railway closed in the late 1970s and most of the line has disappeared back into the peat bogs it was built over. One of the remaining sections of the line includes a bridge over Blacketty Water which I'm using as the basis for my model.
Clearly it's not a particularly big or complex bridge but I was looking for something that I had a could model with a chance of finishing in time, and which would also let me experiment with a bunch of new techniques. To follow up on the question of sleeper size here is a comparison of the test piece of track and the real track.
Having measured from the photo, I think the majority of the sleepers are around 2' 9" wide but I've modelled them as 3' (so 12mm) to give a little more width. Even with the extra width they look very narrow due to the over sized spikes and heavier rail. Given there is not much I can do about the rail or the spikes (I really couldn't handle smaller spikes) I think the track looks like a reasonable representation, especially as when viewed from a normal distance the spikes blend in more than they do in the close up photo. I suppose the other option would be to just glue the rail down and not bother with the spikes given how small they are in real life but somehow that seems like cheating.
Anyway, now you all know what bridge I'm basing my model on hopefully you'll keep making helpful comments as I continue experimenting and then building the final model.
The Duchal Moor Railway, known locally as the Grouse Moor Line, was built by the shipbuilder James Lithgow to help transport people and equipment out to the shooting butts on the moor. When completed in 1922 there was approximately 7 miles of 2ft gauge track. The railway closed in the late 1970s and most of the line has disappeared back into the peat bogs it was built over. One of the remaining sections of the line includes a bridge over Blacketty Water which I'm using as the basis for my model.
Clearly it's not a particularly big or complex bridge but I was looking for something that I had a could model with a chance of finishing in time, and which would also let me experiment with a bunch of new techniques. To follow up on the question of sleeper size here is a comparison of the test piece of track and the real track.
Having measured from the photo, I think the majority of the sleepers are around 2' 9" wide but I've modelled them as 3' (so 12mm) to give a little more width. Even with the extra width they look very narrow due to the over sized spikes and heavier rail. Given there is not much I can do about the rail or the spikes (I really couldn't handle smaller spikes) I think the track looks like a reasonable representation, especially as when viewed from a normal distance the spikes blend in more than they do in the close up photo. I suppose the other option would be to just glue the rail down and not bother with the spikes given how small they are in real life but somehow that seems like cheating.
Anyway, now you all know what bridge I'm basing my model on hopefully you'll keep making helpful comments as I continue experimenting and then building the final model.
Subscribe to:
Posts (Atom)





