Showing posts with label Graham Farish. Show all posts
Showing posts with label Graham Farish. Show all posts

Tuesday, October 8, 2013

Coming Soon...

I mentioned before that there was very little trade at this years Barrow Hill Live. This did mean that I managed to leave without buying anything, although having looked at the Bachmaan display I have a feeling I'll be spending some money soon.

Bachmann's stand wasn't your typical retailer stand as they didn't actually appear to have anything for sale. What they did have was a working N gauge layout (quite fun to watch) and two glass display cupboards showing manufacturing samples of some of their new products.


I was obviously most interested in the N gauge models on display (these are Graham Farish models as Bachmann is the parent company). In the first photo you can see that they are about to release a model of Tornado in BR Blue, the same livery she is currently wearing. The unpainted model in this photo is I believe a Midland 4F, but as they weren't labelled in any way it's hard to be certain. While the model of Tornado looks fantastic both of these are really too big for Jerusalem.

The second photo shows a much more promising candidate to expand Jerusalem's loco fleet; an LMS 3F Jinty. This model will apparently be available in a BR black with the early crest so will match my existing loco nicely, and hopefully it's diminutive size will be reflected in it's cost once available.

The third photo is, however, the most interesting. If you read the previous post then you will know that I'm interested in locomotives that at one time may have travelled along the line at the bottom of our garden; this is one such locomotive. This 2-4-2T was designed by Aspinal for the Lancashire and Yorkshire Railway (although seen here in a BR livery) and I actually have a photo of one in Penistone. Unfortunately, this model is OO gauge and so won't be any use for Jerusalem but I'm still tempted to buy one. If I do buy one though I'll be going for the limited edition version from the National Railway Museum who are going to be releasing it in it's original Lancashire and Yorkshire Railway livery through Locomotion Models.

Friday, September 27, 2013

The 13:05 To Jerusalem

Today’s post was going to be all about sheep, but just before 1pm the post arrived with my repaired locomotive, so I can finally show you a working passenger train.

I thought I'd go for a video rather than a photo and while the train is probably moving a bit to fast and the video quality is poor you should still get the general idea.

Wednesday, September 18, 2013

We Are Sorry To Announce.....

British Railways are sorry to announce that the introduction of a passenger service through Jerusalem, as well as all goods services, will be delayed for an unknown period due to a failed locomotive.
As some of you will know I've recently had a birthday, and many of the presents were train related and will probably turn up on this blog at some point. One of those presents was a Mk 1 57ft suburban brake (Graham Farish model 374-312A) which, for the first time, would have brought a passenger service to Jerusalem. Unfortunately the failure of my only locomotive has brought a halt to "playing trains" for a while -- modelling will continue though.


The locomotive failed almost five months to the day after I bought it and so fortunately it is still under warranty. It has run perfectly, in both directions, since it arrived, at least until Friday last week. The first sign that there was anything wrong was when I tried running it in reverse; it had a pronounced wobble and was making a weird clicking noise. Strangely it ran forward without any issues what so ever. From a quick examination, it appeared that as the wheels rotated the rod connected the middle wheel and valve gear wasn't moving properly as the vertical piece it is connected to wasn't moving at all (it should swing left and right). I was going to see if running it forward for a few minutes would help it settle, but it hadn't moved more than about six inches when the connecting rod popped off (as you can see in the photo). Given that I have no idea what the underlying problem was or how to repair the obvious problem properly it has now been boxed up and sent off for repair under warranty. Hopefully it will return soon.

The coach is, however, excellent and I really am looking forward to being able to run it properly; I've been slightly lucky in that I didn't have anything anywhere near as long as the coach to check clearances when building the landscape and it only just clears the tunnel mouth... but just is enough. I will, however, definitely be more careful with clearances on future layouts, although if I can avoid such tight 1st radius curves in future then the problem will (at least partially) disappear.

Saturday, April 27, 2013

It's 1955

It's 1955 and little Johnny has borrowed his Dad's camera for a day of trainspotting. He isn't expecting to see much as the sleepy branch-line near where he lives isn't exactly a hive of activity. Having settled himself on a sunny bank it isn't long before the distinctive sound of a hard working steam engine echos down the valley and within a few minutes the train emerges from under the nearby road bridge and into view. A quick press of the shutter and Johnny captures for posterity the first visit of the newly built 82026 to his sleepy corner of England.

Of course that is a whole lot of make believe nonsense, but most well built model railways have a back story around which they are constructed and deciding on the year I am going to set my layout in seemed a good place to start. Fortunately the locomotive I'd bought made this really easy.

The locomotive is a Graham Farish model of British Railways Standard Class 3 2-6-2T number 82026. Forty-five examples of this class were built between April 1952 and August of 1955, but number 82026 was apparently completed on the 12th of November 1954. As I want to be able to use green trees and shrubs as part of the scenery on my railway this would mean that the earliest the engine could have appeared on my railway would have been the spring of 1955.

The model I've bought is finished with the early BR logo which it would have worn when initially built. This logo was phased out from 1956 which helps to limit the time window for my model railway to just the spring and summer of 1955; in reality 82026 wouldn't have been repainted with the new logo until it underwent an overhaul meaning that it could have been seen in this livery for a few years after 1955.

I'm still in the planning stages, but to help get a sense of scale I built the road bridge seen in the photo from a scalescenes.com kit. This was actually easier to build than the OO gauge coal office I previously purchased from scalescenes.com, mostly because the thickest cardboard I had to cut was just 1mm. I think I'll probably need to rebuild the bridge at some point as I'm not happy with the position of the retaining walls, but at least it's a start.