Unlike the hold-and-fold I talked about in a previous thread this tool didn't cost me anything as it was included as part of the kit for the RNAD crew van I'm currently building. It is, however, a very useful tool.
I mentioned before that the body of the RNAD crew van fitted into two slots in the 3D printed floor. This tool is provided as part of the fret of etched parts to allow you to easily check that the holes are fully opened out so that the body fits easily. Once you have done this the instructions say you can discard it, but I realized that it would be extremely useful for something else.
The end of the tool is pretty much the same size (width and thickness) as the end of the Greenwich couplings. This makes the tool ideal for checking that the slot for the coupling is fully open. I had previously been using an off cut of the etched fret the couplings come in, but this was a bit fiddly and had led to me cutting my finger, but this tool works perfectly on my recent 3D printed wagons so I'll definitely be holding on to it.
Showing posts with label The Greenwich and District Narrow Gauge Railway Society. Show all posts
Showing posts with label The Greenwich and District Narrow Gauge Railway Society. Show all posts
Friday, June 13, 2014
Saturday, May 10, 2014
Ready To Run
So after the helpful advice from Paul and Bill in the comments to the previous post I've gone ahead and fitted the Greenwich couplings to all three OO9 items I've built so far.
As a compromise between aesthetics and functionality I've only added the hook part to both ends of the locomotives while the open carriage also has the loop fitted at both ends. I'm a little concerned about one of the loops as while a magnet held near it causes it to lift, it doesn't always drop back into place reliably, but I can probably tweak that at a later point when I actually start thing about where the uncoupling ponits will be, but for that I still need to decide on a layout plan.
As a compromise between aesthetics and functionality I've only added the hook part to both ends of the locomotives while the open carriage also has the loop fitted at both ends. I'm a little concerned about one of the loops as while a magnet held near it causes it to lift, it doesn't always drop back into place reliably, but I can probably tweak that at a later point when I actually start thing about where the uncoupling ponits will be, but for that I still need to decide on a layout plan.
Wednesday, May 7, 2014
Coupling Questions
Having now built three OO9 gauge items (a workman's open coach, a Baguely-Drewry diesel locomotive, and most recently the Quarry Hunslet) it is time to think about couplings; it's no point having a waggon that a locomotive can't pull.
In OO9 gauge the consensus seems to be to use couplings designed by The Greenwich and District Narrow Gauge Railway Society and, unsurprisingly, referred to as Greenwich Couplings. Unlike all the couplings I've used in the past, in both OO and N gauge, Greenwich couplings arrive as a kit of parts and need assembling. I have to say that the instructions aren't the easiest to follow, but this video makes assembly nice and straightforward. So far I've made up just a single coupling and before I make up any more, or attach any to the things I've built so far I have a couple of questions. Hopefully someone reading this will have used these couplings before and have some suggestions.
Firstly, the fret of parts has been chemically blackened which seemed like a great idea until I started to make one up, whereupon the black coating just flaked off wherever I bent the part. Am I doing something stupid or am I going to have to prime/paint/varnish the coupling?
Secondly, I'm unsure if I always need to add the loop to the coupling. I've noticed that in quite a few pictures of OO9 layouts the locomotives often don't have the loop on either end, and the rolling stock often only has it at one end. I'm assuming using a loop at only one end means that the waggons etc. always have to be run in the same orientation to one another, which I suppose is okay, and that one loop is enough to form a reliable coupling. I'm certainly tempted to forgo the loop on the locomotives as just the hook looks much better, but I'm tempted to keep the loops on both ends of the rolling stock to give me more flexibility. Can anyone see any problems with that arrangement?
In OO9 gauge the consensus seems to be to use couplings designed by The Greenwich and District Narrow Gauge Railway Society and, unsurprisingly, referred to as Greenwich Couplings. Unlike all the couplings I've used in the past, in both OO and N gauge, Greenwich couplings arrive as a kit of parts and need assembling. I have to say that the instructions aren't the easiest to follow, but this video makes assembly nice and straightforward. So far I've made up just a single coupling and before I make up any more, or attach any to the things I've built so far I have a couple of questions. Hopefully someone reading this will have used these couplings before and have some suggestions.
Firstly, the fret of parts has been chemically blackened which seemed like a great idea until I started to make one up, whereupon the black coating just flaked off wherever I bent the part. Am I doing something stupid or am I going to have to prime/paint/varnish the coupling?
Secondly, I'm unsure if I always need to add the loop to the coupling. I've noticed that in quite a few pictures of OO9 layouts the locomotives often don't have the loop on either end, and the rolling stock often only has it at one end. I'm assuming using a loop at only one end means that the waggons etc. always have to be run in the same orientation to one another, which I suppose is okay, and that one loop is enough to form a reliable coupling. I'm certainly tempted to forgo the loop on the locomotives as just the hook looks much better, but I'm tempted to keep the loops on both ends of the rolling stock to give me more flexibility. Can anyone see any problems with that arrangement?
Subscribe to:
Posts (Atom)



